Boiler rooms · Container building

Boiler rooms in container construction

Modern, prefabricated heat sources – a complete and fully integrated technological system built in a technical container. Ready-to-operate units equipped with all necessary technological devices, installations and security systems.

ETX containerised boiler room

Prefabrication

assembly, tests and commissioning before delivery to the facility

Gas or oil

boilers selected for the type of available fuel

Quick start

shortening the implementation time and assembly work at the facility

Equipment

Basic and optional container equipment

Basic equipment

ready technological system

  • Gas or oil boilers
  • Automation and work monitoring
  • Pumping systems
  • Cut-off, filtering, control and measurement fittings
  • Water and sewage installation
  • Ventilation and exhaust gas installations
  • Technical container lighting

Optional equipment

extensions according to the facility's needs

Water treatment systemsSecurity and gas detection systemsOil warehouse

Prefabrication

Finished unit – tested before delivery

01

Individual project

Selection of thermal power, type of fuel and transport and location conditions.

02

Prefabrication and assembly

Installation of a complete technological system in a technical container.

03

Tests and commissioning

The installation is assembled, tested and launched before delivery to the destination.

04

Delivery and connection

Quick connection and start of operation on site.

Features

Boiler room container can be used as a container

A constant heat sourceMobile temporary boiler roomEmergency heat supply sourceHeat sources for temporary and technological facilities

Applications

Where container boiler rooms come in handy

Industrial facilitiesConstruction sitesTemporary facilitiesModernization of existing boiler roomsLocations with limited technical infrastructure

Projects

Photos from the implementation of container boiler rooms

Implementation

Boiler room container

Implementation

The interior of the container

Implementation

Boiler room on site